An Oregon elevator permit is issued by the Department of Consumer and Business Services (DCBS) through its Building Codes Division (BCD) under ORS 460.005 to 460.175. You need one before installing or altering any elevator, and a separate operating permit before anyone rides it. Installation fees start at $98 for projects costing $1,000 or less and scale with project value, plus a $78 plan review fee. The state is required to act on a complete application within 30 days.1Oregon Public Law. Oregon Revised Statutes 460.055 – Elevator Permits
When a Permit Is Required
ORS 460.045 lists the activities you cannot legally do without authorization from the BCD:2Oregon State Legislature. Oregon Revised Statutes Chapter 460
- Install or alter an elevator without an installation permit.
- Operate an elevator on property you own, control, or manage without a valid operating permit or temporary operation authorization.
- Place a new or altered elevator into service without an operating permit issued after a satisfactory acceptance inspection witnessed by a state elevator inspector.
- Return an elevator to service after an injury without permission from the department.
The alteration trigger catches many owners off guard. Routine repairs generally don’t require a new installation permit, but changes to the controller, hoist machine, capacity, speed, or safety controls do.
Oregon’s definition of “elevator” is also broader than most people expect. ORS 460.005 covers any hoisting and lowering mechanism with a car or platform that moves in guides and serves two or more landings, and explicitly includes dumbwaiters, escalators, manlifts, platform hoists, vertical parking units for motor vehicles, and moving walks.3Oregon Public Law. Oregon Revised Statutes 460.005 – Definitions for ORS 460.005 to 460.175 If you’re installing any of these systems, you’re in permit territory.
Who Files the Application
You cannot file the permit yourself if you’re the building owner. ORS 460.045 prohibits engaging in the business of installing, altering, repairing, or maintaining an elevator without an elevator contractor license, and individual mechanics performing the work must hold a personal license issued under ORS 460.059.2Oregon State Legislature. Oregon Revised Statutes Chapter 460 The BCD will not process a permit application from an unlicensed contractor. Before signing a contract, verify that your elevator company holds a current Oregon elevator contractor license; that contractor will prepare the application, submit plans and specifications, and coordinate inspections.
How to Apply
Permits are purchased online through the BCD’s portal, which also handles minor-alteration labels for smaller jobs.4Building Codes Division. Elevator Services The application includes technical specifications for the equipment (rated load capacity, travel speed, number of landings served, drive type) and engineering plans showing how the elevator integrates with the building’s structural, electrical, and fire-safety systems. State engineers review the designs for code compliance before the permit is issued. A $78 plan review fee applies on top of the permit fee.5Oregon Secretary of State. Oregon Administrative Rule 918-400-0800 – Fees
Installation Permit Fees
Under OAR 918-400-0800, installation and alteration permit fees scale with the total project cost:5Oregon Secretary of State. Oregon Administrative Rule 918-400-0800 – Fees
- $1,000 or under: $98
- $1,001 to $14,999: $98, plus $13 for each additional $1,000 (or fraction) above $1,000
- $15,000 to $49,999: $280, plus $8 for each additional $1,000 (or fraction) above $15,000
- $50,000 or more: $553, plus $3 for each additional $1,000 (or fraction) above $50,000
A $75,000 hydraulic elevator installation, for example, carries a $628 permit fee ($553 base plus $3 times 25 for the amount above $50,000), plus the $78 plan review fee. Two fee exemptions are worth knowing: the state charges nothing for alterations limited to accessibility fixture upgrades meeting state-adopted standards, and nothing for car interior upgrades that don’t change the car’s gross weight by more than five percent.5Oregon Secretary of State. Oregon Administrative Rule 918-400-0800 – Fees
How Long the Review Takes
Oregon law requires DCBS to approve or reject submitted plans and issue or deny an installation permit within 30 days of receiving a complete application.1Oregon Public Law. Oregon Revised Statutes 460.055 – Elevator Permits That’s a statutory ceiling, not an average. Incomplete submissions or design questions extend the practical timeline, so clean, thoroughly documented applications move fastest.
Acceptance Inspection and Operating Permit
An approved installation permit doesn’t put the elevator into service. Under ORS 460.045, a state elevator inspector must witness safety tests on the completed equipment before the department issues an operating permit.2Oregon State Legislature. Oregon Revised Statutes Chapter 460 Your contractor schedules this through the BCD inspector assigned to your area.4Building Codes Division. Elevator Services
If the equipment falls short of certain standards but poses no immediate hazard, the BCD can issue a provisional operating permit for a set period during which you must bring the elevator into full compliance.1Oregon Public Law. Oregon Revised Statutes 460.055 – Elevator Permits The operating permit, or a copy, must be posted in clear view inside the elevator. A missing or expired permit is one of the first things a state inspector checks.2Oregon State Legislature. Oregon Revised Statutes Chapter 460
Operating Permit Fees
Each operating permit carries a recurring fee that varies by equipment type and, for passenger and freight elevators, by the number of floors served:5Oregon Secretary of State. Oregon Administrative Rule 918-400-0800 – Fees
- Passenger or freight elevator, four floors or under: $176
- Passenger or freight elevator, five to nine floors: $216
- Passenger or freight elevator, ten to nineteen floors: $268
- Passenger or freight elevator, twenty floors or more: $314
- Escalator or moving walk: $196
- Stairway chairlift or dumbwaiter: $120
- Vertical wheelchair lift: $176
A 12 percent surcharge is added to each of these fees at purchase. Reinspection after a failed follow-up visit costs $75, and special inspections, testing, consultations, or site visits not covered by another fee category are billed at $75 per hour for travel and inspection time.5Oregon Secretary of State. Oregon Administrative Rule 918-400-0800 – Fees
Periodic Inspections After the Permit Is Issued
ORS 460.125 requires the department to inspect each elevator periodically to confirm it’s being operated and maintained according to state law.6Oregon Public Law. Oregon Revised Statutes 460.125 – Periodic Inspection of Elevators and Permits The BCD schedules these general safety inspections every two years.4Building Codes Division. Elevator Services The department does not need to perform the inspection itself if a certified elevator inspector employed by a casualty insurance company conducts it and files a copy of the inspection report within 30 days of the due date. Owners with multiple elevators often use this route because insurance-company inspectors can schedule more flexibly than the state.
Oregon adopts national safety codes, including ASME A17.1, which require maintenance records for every elevator, escalator, and moving walk. Those records belong to the building owner, not the service company; when you change contractors, the outgoing company must leave the records with you.
Penalties for Operating Without a Permit
Violating any provision of ORS 460.005 through 460.175 is a Class C misdemeanor.2Oregon State Legislature. Oregon Revised Statutes Chapter 460 More often used in practice, DCBS can order a noncompliant elevator disconnected from its power source. The department must give reasonable notice before cutting power unless the elevator poses an immediate hazard to health and safety, in which case disconnection can happen without warning. Owners who disagree with an inspector’s finding can appeal to the Electrical and Elevator Board.6Oregon Public Law. Oregon Revised Statutes 460.125 – Periodic Inspection of Elevators and Permits
Accessibility Work: Fee Waiver and Federal Credit
If the project is an accessibility upgrade, Oregon waives the permit fee for alterations limited to accessibility fixture upgrades meeting state-adopted standards.5Oregon Secretary of State. Oregon Administrative Rule 918-400-0800 – Fees
On the federal side, eligible small businesses can claim a disabled access credit under 26 U.S.C. ยง 44 equal to 50 percent of eligible access expenditures between $250 and $10,250, for a maximum annual credit of $5,000. Eligible expenditures include removing architectural barriers that prevent a business from being accessible to individuals with disabilities. The credit does not apply to expenses connected with a facility first placed in service after the law’s enactment, so it generally covers retrofits to existing buildings rather than new construction.7Office of the Law Revision Counsel. 26 USC 44 – Expenditures to Provide Access to Disabled Individuals